Content of the Service
Within the scope of Erasmus+ Grant Program, “Save Life” Project is carried out by our company in partnership with Yıldız Technical University:
Within the scope of the program, the following activities will be carried out during the 24-month period:
1) Innovative, modular course design, digital tools and medical students, nurses, paramedics and general practitioners to ensure the sustainability of their professional development and preparations on basic and advanced life support and to equip them with the necessary information to reduce the target audience, with accurate and timely intervention in emergency situations. to reduce,
2) Ensuring equal access of healthcare personnel to B/ALS training and raising awareness of social differences in receiving emergency response,
3) To provide and certify digital and continuously accessible, free, innovative, inclusive education content to partner country institutions and target audience by preparing LMS and interactive training content with the determined 6 priority Basic and Advanced Life Support topics.
- Project
- RQ Consultancy Ltd. Co.
- 15/12/2022
- https://rq.com.tr
- 28.780,00 €

